Your groundworkers deliver the build. We ensure roads and sewers meet adoption standards from day one, working alongside your delivery team to reduce rework, lower bond exposure and achieve adoption up to 80% faster.

The Traditional Approach to Estate Completions Is Costing Developers Millions Every Year.
For years, estate completion has been treated as a final-stage activity. Groundworks focus on delivery, while adoption compliance is often addressed later.
The result is a process gap that leads to defects being identified too late, rework being required, spiralling costs, and rising bond liability.
Issues are only identified at authority inspection stage, when contractors have demobilised and new teams must be brought in to remediate.
Corrective works, redesigns and additional inspections create fragmented invoicing and erode cost control.
Delays quietly inflate bond exposure year on year, tying up capital that could be released sooner.
A Specialist Approach to Estate Completion, From Day One.
JLES brings adoption expertise into the programme early, aligning design, construction and authority requirements from the outset. The result is fixed-fee, results-based estate completion that removes rework and accelerates adoption.
No rework bills. No spiralling costs. Predictable budgeting and clear invoicing.
Everything is built to standard as you go, not retrospectively corrected.
We coordinate authorities, inspections, utilities, contractors and documentation through to full sign-off.
A Specialist Approach to Estate Completion, From Day One.
JLES brings adoption expertise into the programme early, aligning design, construction and authority requirements from the outset. The result is fixed-fee, results-based estate completion that removes rework and accelerates adoption.
Whether we’re appointed early or brought in later, our process is designed to remove uncertainty, reduce rework and drive estates to adoption as efficiently as possible.
JLES undertake a ‘free of charge’ desk-based review and report including:
• Review of information provided by client.
• Initial contact with adopting authority to check status from their records.
• Production of email report containing findings and recommendations to proceed with the adoption.
• Quotation to undertake an essential investigation works.
JLES undertake any essential site investigations works (site specific) and review all technical, consultancy and legal requirements to secure adoption. Upon completion of the investigation works, we issue our client with a detailed Adoption Solution Report. These works may include:
• Liaison with the adopting authority.
• Conduct visual inspections of highways alongside the adopting authority.
• Undertake visual inspection of manholes with council or water company (highway drainage or Section 104).
• CCTV survey of sewers.
• As-built surveys.
• Review legals inc. sewer and WAF easements, service verge issues etc.
• Review status of agreements, technical approval, and engrossments design amendments and CAD work.
• Review all technical and legal requirements
Site remedial works
• Manhole remedials and sewer length excavations.
• Pump stations works.
• Specialist sewers lining.
• Highways remedials and final surfacing.
• Street lighting works.
• Service diversions and utility works.
• Water box works.
Technical and consultancy
• Liaison with adopting authority and coordination of interim inspections.
• Resident liaison throughout project.
• Site surveys and drawings.
• Support with agreements (104, 102, 185, 38, 37, 278, 111).
• Production of adoption documentation (CDM file, PS manuals etc).
• Health and safety reviews.
Legal Works
• Managing legal works including 3rd party liaison.
• Internal Solicitor.
• New and retrospective Easements.
• Land transfer and conveyancing.
• Service verge issues.
• Liaison with Adopting Authority.
• Any outstanding technical works.
• Produce site inventory (as required).
• Obtain maintenance or adoption certificate.
Whether we’re appointed early or brought in later, our process is designed to remove uncertainty, reduce rework and drive estates to adoption as efficiently as possible.
Get in touch to find out how we can take your estates to final completion.